A、Cabinet installation accessories

1 . Cabinet installation wheels , as “ Figure 1 ” use 16 pics M6 * 14 Phillips hex screw with spring was her lock ( locking torque is: 10Nm);

2 . Paste the epoxy boards 1/ 2/ 3 in order inside the cabinet , First tear off the epoxy board adhesive film centrifugal paper, as“ Figure 2 ” Paste in the corresponding location .

3 . As“ Figure 3 ” Check the assembly as required, and paste EVA foam and PC gasket on the corresponding surface of the battery core . The overall position is as shown in the diagram (next page) to separate the battery cells

Material: cabinet* 1PCS , wheel*4PCS , Epoxy board A * 2PCS , Epoxy board B * 2PCS , Epoxy board C * 2PCS , M6 * 14Phillips hex screw with spring washer * 16PCS

 

Tool:

Electric batch、 10mmsleeve、

PH2Cross bits

 

B. Cell stacking

1 .As“ Figure  1   ” After the batteries are tested and assembled as

required, EVA foam and PC gaskets are pasted on the corresponding surfaces of the batteries. The overall position is as shown in the

schematic diagram in "Figure 1" to separate the batteries.

2 .As shown in " Figure 1 and Figure 2 ", stack the cells in series and put them into the cabinet . Separate them with epoxy board B between the two columns, and attach the epoxy board to the end plate cells.

3.Install end plate ,as “ Figure    3  ”use 6 pics M8*20 Phillips hex screw with spring washer lock(locking torque is: 15Nm)

Material :

End plate* 1PCS , cell* 16PCS , Battery core foam*28PCS ,

Epoxy boardA* 1PCS , Epoxy boardB*3PCS , Epoxy boardC*2PCS ,

M8*20Phillips hex screw with spring washer *6PCS , PC gasket*56PCS

Tool: Electric batch、 13mmsleeve、 PH2Cross bits              

Note: Because there are tolerances in battery cells from different manufacturers, if there are still loose parts after applying foam according to the instructions, add foam filling at the head and tail.

 

C , Install aluminum row

1 . Install aluminum row ,as “ Figure     1  ”Install series  aluminum

bars on the poles .

2.Apply pressure strip foam,as “ Figure    2  ” Paste EVA foam on the

batten and align the holes.

3.Install the sampling plate on the batten,as “ Figure     3    ” use 6 pics M4*8  Phillips hex screw with spring washer lock( locking torque is: 3Nm)

Material :

Foam*2PCS ,Layering*2PCS , Sampling plate*2PCS ,

M4*8Phillips hex screw with spring washer * 12PCS ,

SF-N1Aluminum row* 14PCS , SF-N13Aluminum row* 1PCS

Tool: Electric batch、 10mmsleeve、 PH2Cross bits

D : Install pressure strips and balance board sampling lines

1.Install the bead, as shown in "Picture 1", you need to distinguish between A/ B boards, use 8 pics M5 *8 Phillips hex screw with spring washer lock ,( locking torque is: 5Nm)

2.Install the sampling wire lug. As shown in "Figure 2", insert the sampling wire lug into the pole at the corresponding position;

3.Install thebalancing plate sampling line, as shown in " Figure 2", install the sampling line at the corresponding position, and then use 30 M6 flange nuts to lock the aluminum row  ( locking torque is: 6Nm) ;

4.Tie straps to secure equalization sampling lines.

Material :

Balance board sampling line*2PCS, M5 * 8Phillips hex screw with spring was her * 8PCS, M6flange nut*30PCS

Tool:Electric batch、 10mmsleeve、 PH2Cross bits、

Torque breakers

 

F:  Install BMS into sheet metal

1.BMS installed on sheet metal bracket  ,as “ figure   1” BMS is installed on the sheet metal bracket ,use 6 pics M3*8 Phillips round head screw lock( locking torque is: 1Nm)

2.Install the YS-6/YS-8 copperbusbar and fix it with the screws provided by BMS. (The locking force of the copper row screw is: 8Nm)

3.Install the small B+ line and fix it with the screws provided by BMS. (locking torque is: 1Nm)

4.Insert samplinglines A and B, and insert screen lines.

 

E : Balance board, front panel installation accessories

1.Attach a thermalpad to thebalancing board, as shown in the figure "1".

2.Top plate installation accessories: As shown in "Figure 2", install the balancing plate and adapter plate,use 3

pics M3*8 Phillips screw lock( locking torque is:1Nm) Install terminal socket*2;use 8 pic M4*10Hexagon . socket screws lock( locking torque is  :3Nm) . Install the switch key; solder the plug on the switch key, then insert and fasten it corresponding to ON/OFF;Install the fuse holder, use 2 pics M6* 14Phillips hex screw with spring washer lock (locking torque is:6Nm);Install fuses and copper bars: YS-4, YS-7; use the screws provided with the fuse to fix them(locking torque is : 8Nm)

3.Plugin the data cable of the adapter board.

Material :Roof* 1PCS , balance board * 1PCS ,

Copper rowYS-7 * 1PCS ,YS-4 * 1PCS ,Adapter board  data cable*3PCS ,connector socket*2PCS , adapter board * 1PCS , power button * 1PCS ,fuse holder *  1PCS ,fuse * 1PCS, M4 * 10Hex socket flat head

screw * 8PCS , M3 * 8 Phillips round head screw*4PCS , M6 * 14Phillips hex screw with spring was her*2PCS , M8 * 16Phillips hex screw with spring was her * 1PCS

Tool:Electric batch、 PH2Cross bits、 PH1Cross bits、 10mmsleeve、 13mmsleeve、

G.Install the BMS bracket and the front panel into the chassis:

1.Install the BMS bracket into the cabinet, as shown in "figure 1" and

"figure 2"use 4 pics M5*14Phillips hex screw with spring washer lock

(locking torque is:5Nm);

2.Install roof ,as “ Figure 3” use M4*10 Hex socket countersunk screw

lock(locking torque is :3Nm)

3.As shown in "Figure 4", insert the sampling line plug of the

equalization board and the switch line plug into the BMS.

4As shown in Figure "5", install the B-copper bar, sampling wire lugs,

and the negative power cord of the balancing board; use M6 flange nut

lock (locking torque is:6Nm);

5.As shown in "Figure 5", insert the blackhead sampling line;

6.As shown in "Figure 5", install the B+ copper bar, the small B+ line

sampling wire lug, and the positive power line of the equalization

board;use M6flange nut lock (locking torque is:6Nm);

7.Insert the white head sampling line as shown in "Figure 2"

8.P- YS-8Copper row use M8*16Phillips hex screw with spring washer

lock (locking torque is: 15Nm)

Material:

M5*14Phillips hex screw with spring washer*4PCS,

M4*10 Hex socket countersunk screw*14PCS,

M6 flange nut *2PCS,M8*16Phillips hex screw with springwasher *1PCS.

Tool:Electric batch、10mmsleeve、 13mmsleeve、PH2Cross bits

H,Cabinet cover processing and closing

1.Cabinet cover installation accessories, such as "figure 1" installation of display screen, LED light, use M3*8 Phillips round head screw lock

(locking torque is: 1Nm) ;

2.As shown in "Figure 2", insert the display cable and LED light cable.

3.As shown in "Figure 3 and 4", close the cabinet cover use 17 pics  M4* 10 Hex socket countersunk screw lock(locking torque is: 3Nm)

4.As shown in "figure 3 and 4", attach the LCD sticker.

5.After installation, the BMS needs to perform capacity learning. Specific steps: Fully charge the battery first.( Recommended current100A)

Put it into battery system protection( Recommended current100A)Charge to 50% battery( Recommended current100A) Complete capacity learning

Material :Cabinet cover* 1PCS, Display* 1PCS, LED light panel * 1 , M3*8 Phillips round head screw*6PCS, M4* 10Hex socket

countersunk screw * 17PCS, PVC sticker* 1PCS

Tool:Electric batch 、 PH1Cross bits、 Hexagonal H2.5 bit